ROI Calculator

eMCM Investment Details

How many eMCM modules you plan to install
$
Cost per individual eMCM module
Period for calculating ROI (1-20 years)
Please add the required number of equipment entries.
Equipment #1 New Equipment
Equipment Information
$
hours
years
Energy and Emission Analysis
kW
Existing condition
%
Power reduction percentage
kW
Automatically calculated
Maintenance Analysis
$
Existing condition
%
Maintenance cost reduction %
$
Automatically calculated
Downtime Analysis
hrs/yr
%
Downtime reduction %
hrs/yr
$ /hour
Equipment Life Analysis
years
%
Lifespan increase %
years
Total Savings Summary
Category Amount
Cost of 1 eMCM -
Energy Savings -
Maintenance Savings -
Downtime Savings -
Equipment Life Savings -
Efficiency Savings -
Total Savings -
Payback Period -
Note: Adjust the “Before” values and “%” fields to see automatic updates of “After” fields. Check or uncheck the “Include in ROI” switches as needed. Pump efficiency is handled separately if you select “Pump” as the equipment type.

ROI Analysis Results

Total Investment

$0

eMCM installation cost

ROI Percentage

0%

Return on investment over analysis period

Payback Period

0

Time to recoup investment (months)

Total Savings

$0

Total savings over analysis period

Analysis Summary: Your eMCM investment analysis will appear here after calculation.
Savings Breakdown
Energy Savings

$0

0% of total

Maintenance Savings

$0

0% of total

Downtime Savings

$0

0% of total

Equipment Life

$0

0% of total

Efficiency Savings

$0

0% of total

Equipment Savings Details
Equipment Name Type Energy Savings Maintenance Savings Downtime Savings Equipment Life Efficiency Savings Total Savings

Contact Info

58 Thomas St, New York, 10013 USA

+1 201 793-7150

enquiry@artesis.com